https://www.avient.com/sites/default/files/resources/TRA%2520-%25202016%2520Annual%2520Report%2520for%252017%2520Tideman.pdf
Report Preview - National Pollutant Release Inventory (NPRI) and Partners
Canada.gc.ca Services Departments Français
SWIM 2016 Polyone Canada Inc.
Business Number:
898451794
Mailing Address:
Address Line 1: 17 Tideman Drive
City, Province/Territory, Postal Code: Orangeville Ontario L9W3K3
Country: Canada
Facility Name:
Orangeville Compound
NAICS Code:
326198
NPRI ID:
4358
Physical Address:
Address Line 1: 17 Tideman Drive
City, Province/Territory, Postal Code: Orangeville Ontario L9W3K3
Country: Canada
Latitude: 43.91230
Longitude: 80.11300
Number or Permit Number:
ON9820023
Government Department, Agency, or Program
Name:
Ontario MOE Hazardous Waste Generator Number
Number or Permit Number:
07786DZLMV
Government Department, Agency, or Program
Name:
Certificate of Approval Air
Number or Permit Number:
56265DFQF2
Government Department, Agency, or Program
Name:
Certificate of Approval Industrial Sewage Works
Contact Type
Technical Contact, Company Coordinator
Name:
Brian Greer
about:/V003/Html
http://www.canada.gc.ca/home.html
http://www.servicecanada.gc.ca/eng/home.shtml
http://www.canada.gc.ca/aboutgov-ausujetgouv/depts/menu-eng.html
https://ec.ss.ec.gc.ca/auth/en/Services
about:blank#
about:blank#
about:blank#
about:/V003/Logout_Deconnexion
http://ec.gc.ca/default.asp?
lang=En&n=FD9B0E51-1
https://ec.ss.ec.gc.ca/auth/en/Services
about:/
about:/
about:/
General Information
Substance List
CAS RN Substance Name Releases Releases (Speciated VOCs) Disposals Recycling Unit
NA 01 Antimony (and its compounds) 0.0004 N/A N/A N/A tonnes
NA 02 Arsenic (and its compounds) 0.0007 N/A N/A N/A kg
103231 Bis(2ethylhexyl) adipate 0.0106 N/A N/A N/A tonnes
117817 Bis(2ethylhexyl) phthalate 0.0283 N/A N/A N/A tonnes
85687 Butyl benzyl phthalate 0.0008 N/A N/A N/A tonnes
NA 14 Zinc (and its compounds) 0.0000 N/A N/A 0.0002 tonnes
Applicable Programs
CAS RN Substance Name NPRI ON MOE TRA ON MOE Reg 127/01
First report for
this substance to
the ON MOE TRA
NA 01 Antimony (and its compounds) Yes
NA 02 Arsenic (and its compounds) Yes
103231 Bis(2ethylhexyl) adipate Yes
117817 Bis(2ethylhexyl) phthalate Yes
85687 Butyl benzyl phthalate Yes
NA 14 Zinc (and its compounds) Yes
Position:
EHS Manager
Telephone:
5192150535
Email:
brian.greer@polyone.com
Contact Type
Certifying Official
Name:
Najat Kamal
Position:
EHSQ specialist
Telephone:
5148089920
Email:
najat.kamal@polyone.com
Number of employees:
45
Activities for Which the 20,000Hour Employee
Threshold Does Not Apply:
None of the above
Activities Relevant to Reporting Dioxins,
Furans and Hexacholorobenzene:
None of the above
Activities Relevant to Reporting of Polycyclic
Aromatic Hydrocarbons (PAHs):
Wood preservation using creosote: No
Is this the first time the facility is reporting to
the NPRI (under current or past ownership):
No
Is the facility controlled by another Canadian
company or companies:
No
Did the facility report under other
environmental regulations or permits:
No
Is the facility required to report one or more
NPRI Part 4 substances (Criteria Air
Contaminants):
No
Was the facility shut down for more than one
week during the year:
No
Operating Schedule Days of the Week:
Mon, Tue, Wed, Thu, Fri
Usual Number of Operating Hours per day:
24
Usual Daily Start Time (24h) (hh:mm):
00:00
General Information about the Substance Releases and Transfers of the Substance
CAS RN
Substance
Name
Was the substance
released onsite
The substance will be reported as the sum of
releases to all media (total of 1 tonne or less)
1 tonne or more of a Part 5 Substance
(Speciated VOC) was released to air
NA 01
Antimony (and
its compounds)
Yes Yes No
NA 02
Arsenic (and its
compounds)
Yes No No
103231
Bis(2ethylhexyl)
adipate
Yes Yes No
117817
Bis(2ethylhexyl)
phthalate
Yes Yes No
85687
Butyl benzyl
phthalate
Yes Yes No
NA 14
Zinc (and its
compounds)
Yes No No
General Information about the Substance Disposals and Offsite Transfers for Recycling
CAS RN
Substance
Name
Was the substance disposed of (onsite or off
site), or transferred for treatment prior to final
disposal
Is the facility required to report on disposals of
tailings and waste rock for the selected
reporting period
Was the substance
transferred offsite for
recycling
NA 01
Antimony
(and its
compounds)
No No No
NA 02
Arsenic (and
its
compounds)
No No No
103231
Bis(2
ethylhexyl)
adipate
No No No
117817
Bis(2
ethylhexyl)
phthalate
No No No
85687
Butyl benzyl
phthalate
No No No
NA 14
Zinc (and its
compounds)
Yes No No
General Information about the Substance Nature of Activities
CAS RN Substance Name Manufacture the Substance Process the Substance Otherwise Use of the Substance
NA 01 Antimony (and its compounds) For onsite use/processing As a reactant As a byproduct
NA 02 Arsenic (and its compounds) For onsite use/processing As a reactant As a byproduct
103231 Bis(2ethylhexyl) adipate For onsite use/processing As a reactant As a byproduct
117817 Bis(2ethylhexyl) phthalate For onsite use/processing As a reactant As a byproduct
85687 Butyl benzyl phthalate For onsite use/processing As a reactant As a byproduct
NA 14 Zinc (and its compounds) For onsite use/processing As a reactant As a byproduct
Onsite Releases Releases to air
CAS RN Substance Name Category Basis of Estimate Detail Code Quantity
NA 02 Arsenic (and its compounds) Stack or Point Releases O Engineering Estimates 0.0000 kg
NA 14 Zinc (and its compounds) Stack or Point Releases O Engineering Estimates 0.0000 tonnes
Onsite Releases Releases to air Total
CAS RN Substance Name Total Releases to Air
NA 02 Arsenic (and its compounds) 0.0000 kg
NA 14 Zinc (and its compounds) 0.0000 tonnes
Onsite Releases Releases to land
CAS RN Substance Name Category Basis of Estimate Detail Code Quantity
NA 02 Arsenic (and its compounds) Other O Engineering Estimates 0.0007 kg
Onsite Releases Nature of Other Land Release
CAS RN Substance Name Nature of Other Land Release
NA 02 Arsenic (and its compounds) Landfill disposal
CAS RN Substance Name Nature of Other Land Release
Onsite Releases Releases to land Total
CAS RN Substance Name Total Releases to Land
NA 02 Arsenic (and its compounds) 0.0007 kg
Total Quantity Released (All Media)
CAS RN Substance Name Category Basis of Estimate Detail Code Quantity
NA 01 Antimony (and its compounds) Total Quantity Released O Engineering Estimates 0.0004 tonnes
103231 Bis(2ethylhexyl) adipate Total Quantity Released O Engineering Estimates 0.0106 tonnes
117817 Bis(2ethylhexyl) phthalate Total Quantity Released O Engineering Estimates 0.0283 tonnes
85687 Butyl benzyl phthalate Total Quantity Released O Engineering Estimates 0.0008 tonnes
Onsite Releases Total
CAS RN Substance Name Total releases
NA 02 Arsenic (and its compounds) 0.0007 kg
NA 14 Zinc (and its compounds) 0.0000 tonnes
Onsite Releases Quarterly Breakdown of Annual Releases
CAS RN Substance Name Quarter 1 Quarter 2 Quarter 3 Quarter 4
NA 01 Antimony (and its compounds) 25 25 25 25
NA 02 Arsenic (and its compounds) 25 25 25 25
103231 Bis(2ethylhexyl) adipate 25 25 25 25
117817 Bis(2ethylhexyl) phthalate 25 25 25 25
85687 Butyl benzyl phthalate 25 25 25 25
Onsite Releases Reasons for Changes in Quantities Released from Previous Year
CAS RN Substance Name Reasons for Changes in Quantities from Previous Year Comments
103231 Bis(2ethylhexyl) adipate No significant change (i.e.
https://www.avient.com/sites/default/files/2024-10/Avient_CodeConduct_2024_final2.pdf
The hotline is operated by an
external professional service company that provides these
services to many companies.
All sales to
customers should be based on price, terms and the quality
of the product and service to be provided.
We choose our suppliers based on objective criteria, such as
quality, service and price and the business benefits to Avient
and our customers.
https://www.avient.com/sites/default/files/2023-03/2023 Avient Bookmarked Proxy Statement - FINAL.pdf
We offer a broad portfolio of technologies that help our customers—and our planet—be more
sustainable.
We have defined our sustainability portfolio in the eight
ways we help our customers meet their innovation and sustainability goals.
Ashland”), a global leader in providing specialty chemical solutions to
customers in a wide range of customer and industrial markets.
https://www.avient.com/sites/default/files/resources/PolyOne%25202018%2520Proxy%2520Statement.PDF
Our telephone number is (440) 930-1000.
Wulfsohn
Chairman and Chief Executive Officer of Ashland Global
Holdings Inc., a global leader in providing specialty chemical
solutions to customers in a wide range of customer and
industrial markets, since January 2015.
Payments Upon Separation from Service.
https://www.avient.com/sites/default/files/2024-07/Colorants _ Additives for Appliances Brochure.pdf
Services
include a focus on aesthetics, functionality, feasibility
assessment, and project coordination.
Incorporating UV stability helps prolong the service
life and aesthetics of appliances.
PERFORMANCE
A growing number of consumers are looking into the sustainability of appliances not only from the angle of
energy consumption but also in terms of materials used to manufacture them.
https://www.avient.com/sites/default/files/resources/Forward%2520Looking%2520Statements%2520and%2520Non%2520GAAP%2520Measures.pdf
They are based on management’s expectations that involve a number of business risks and uncertainties, any of which could cause
actual results to differ materially from those expressed in or implied by the forward-looking statements.
Factors that could cause actual results to differ materially from those implied by these forward-looking statements include, but are not limited to:
� Disruptions, uncertainty or volatility in the credit markets that could adversely impact the availability of credit already arranged and the availability
and cost of credit in the future;
� The financial condition of our customers, including the ability of customers (especially those that may be highly leveraged and those with inadequate
liquidity) to maintain their credit availability;
� The speed and extent of an economic recovery, including the recovery of the housing market;
� The amount and timing of repurchases, if any, of PolyOne common shares and our ability to pay regular quarterly cash dividends and the amounts and
timing of any future dividends;
� The effect on foreign operations of currency fluctuations, tariffs, and other political, economic and regulatory risks;
Changes in polymer consumption growth rates in the markets where we conduct business;
Forward Looking Statements
� Changes in polymer consumption growth rates in the markets where we conduct business;
� Changes in global industry capacity or in the rate at which anticipated changes in industry capacity come online;
� Fluctuations in raw material prices, quality and supply and in energy prices and supply;
� Production outages or material costs associated with scheduled or unscheduled maintenance programs;
� Unanticipated developments that could occur with respect to contingencies such as litigation and environmental matters;
� An inability to achieve or delays in achieving or achievement of less than the anticipated financial benefit from initiatives related to working capital
reductions, cost reductions, employee productivity goals, and an inability to raise or sustain prices for products or services;
� The ability to successfully integrate acquired companies into our operations, retain the management teams of acquired companies, and retain
relationships with customers of acquired companies, including without limitation, Color Matrix Group, Inc.
https://www.avient.com/sites/default/files/2024-08/Avient-2023-Sustainability-Report_5.pdf
Until that number is zero,
we have more work to do.
Customs and Border Protection, and a member of the
Canadian Border Services Agency Partners in Protection (PIP) program.
The number of prioritized risk assessments continue to grow each
year as the process matures.
https://www.avient.com/sites/default/files/2024-08/Avient 2023 Sustainability Report_6.pdf
Until that number is zero,
we have more work to do.
Customs and Border Protection, and a member of the
Canadian Border Services Agency Partners in Protection (PIP) program.
The number of prioritized risk assessments continue to grow each
year as the process matures.
https://www.avient.com/sites/default/files/2024-03/2024 Proxy Statement %28Filed%29.pdf
We offer a broad portfolio of technologies that help our customers—and our planet—be more
sustainable.
Ashland”), a global leader in providing specialty chemical solutions to
customers in a wide range of customer and industrial markets.
Name
Number of Deferred Shares(1)
(#)
R.E.
https://www.avient.com/sites/default/files/2020-09/edgetek-processing-guide.pdf
Edgetek™
HIGH PERFORMANCE
FORMULATIONS
PROCESSING GUIDE
Edgetek™
The Edgetek™ High Performance Formulations portfolio covers a broad range of standard and custom formulated materials.
This portfolio includes high-temperature materials for elevated service temperature environments, high-modulus/structural
materials for load-bearing and high-strength applications, and flame-retardant products.
PROBLEM CAUSE SOLUTION
Excessive Shrink Too much orientation • Increase packing time and pressure
• Increase hold pressure
• Decrease melt temperature
• Decrease mold temperature
• Decrease injection speed
• Decrease screw rpm
• Increase venting
• Increase cooling time
Not Enough Shrink Too little orientation • Decrease packing pressure and time
• Decrease hold pressure
• Increase melt temperature
• Increase mold temperature
• Increase injection speed
• Increase screw rpm
• Decrease cooling time
Burning Melt and/or mold
temperature too hot
Mold design
Moisture
• Decrease nozzle and barrel temperatures
• Decrease mold temperature
• Decrease injection speed
• Clean, widen and increase number of vents
• Increase gate size or number of gates
• Verify material is dried at proper conditions
Nozzle Drool Nozzle temperature too hot • Decrease nozzle temperature
• Decrease back pressure
• Increase screw decompression
• Verify material has been dried at proper conditions
Weld Lines Melt front temperatures
too low
Mold design
• Increase pack and hold pressure
• Increase melt temperature
• Increase vent width and locations
• Increase injection speed
• Increase mold temperature
• Decrease injection speed
• Increase gate size
• Perform short shots to determine fill pattern and verify
proper vent location
• Add vents and/or false ejector pin
• Move gate location
Warp Excessive orientation
Mold design
• Increase cooling time
• Increase melt temperature
• Decrease injection pressure and injection speed
• Increase number of gates
Sticking in Mold Cavities are overpacked
Mold design
Part is too hot
• Decrease injection speed and pressure
• Decrease pack and hold pressure
• Decrease nozzle and barrel temperatures
• Decrease mold temperature
• Increase cooling time
• Increase draft angle
• Decrease nozzle and barrel temperatures
• Decrease mold temperature
• Increase cooling time
TROUBLESHOOTING RECOMMENDATIONS
PROBLEM CAUSE SOLUTION
Incomplete Fill Melt and/or mold
temperature too cold
Mold design
Shot Size
• Increase nozzle and barrel temperatures
• Increase mold temperature
• Increase injection speed
• Increase pack and hold pressure
• Increase nozzle tip diameter
• Check thermocouples and heater bands
• Enlarge or widen vents and increase number of vents
• Check that vents are unplugged
• Check that gates are unplugged
• Enlarge gates and/or runners
• Perform short shots to determine fill pattern and verify
proper vent location
• Increase wall thickness to move gas trap
to parting line
• Increase shot size
• Increase cushion
Brittleness Melt temperature too low
Degraded/Overheated material
Gate location and/or size
• Increase melt temperature
• Increase injection speed
• Measure melt temperature with pyrometer
• Decrease melt temperature
• Decrease back pressure
• Use smaller barrel/excessive residence time
• Relocate gate to nonstress area
• Increase gate size to allow higher flow speed and lower
molded-in stress
Fibers on Surface
(Splay)
Melt temperature too low
Insufficient packing
• Increase melt temperature
• Increase mold temperature
• Increase injection speed
• Increase pack and hold pressure, and time
• Increase shot size
• Increase gate size
Sink Marks Part geometry too thick
Melt temperature too hot
Insufficient material volume
• Reduce wall thickness
• Reduce rib thickness
• Decrease nozzle and barrel temperatures
• Decrease mold temperature
• Increase shot size
• Increase injection rate
• Increase packing pressure
• Increase gate size
Flash Injection pressure too high
Excess material volume
Melt and/or mold
temperature too hot
• Decrease injection pressure
• Increase clamp pressure
• Decrease injection speed
• Increase transfer position
• Decrease pack pressure
• Decrease shot size
• Decrease injection speed
• Decrease nozzle and barrel temperatures
• Decrease mold temperature
• Decrease screw speed
TROUBLESHOOTING RECOMMENDATIONS
www.avient.com
Copyright © 2020, Avient Corporation.