https://www.avient.com/sites/default/files/2024-08/Avient-2023-Sustainability-Report_6.pdf
Winona, Minnesota Pune, India(a) (d)
8.
Taoyuan, Taiwan 8.
Performance—The Highest Ethical Standards; Ethics Hotline; Enterprise Risk Management Pages 68, 69, 70
Avient 2023 Annual Report—Form 10-K Pages 8–15
Operational Safety, Emergency Preparedness & Response
Process Safety Incidents Count (PSIC), Process Safety Total Incident
Rate (PSTIR), and Process Safety Incident Severity Rate (PSISR) RT-CH-540a.1
1.
https://www.avient.com/sites/default/files/2020-12/artisan-thermoplastics-nylon-processing-guide.pdf
Place vents at each 90° intersection and vent to atmosphere
8.
Cut vent depths to 0.0007″–0.0015″
Draft Angle Maintain a minimum draft angle of 1° per side
4 Artisan Pre-Colored Thermoplastics
Incomplete Fill
Melt and/or mold
too cold
• Increase nozzle and barrel temperatures
• Check thermocouples and heater bands
Shot size
• Increase shot size
• Adjust transfer position to 98% full
• Increase cushion
Mold design
• Enlarge or widen vents and increase number of vents
• Check that vents are unplugged
• Check that gates are unplugged
• Enlarge gates and/or runners
• Perform short shots to determine fill pattern
and verify proper vent location
• Increase wall thickness to move gas trap to
parting line
Brittleness
Degraded/overheated
material
• Decrease melt temperature
• Decrease back pressure
• Use smaller barrel
Gate location
and/or size
• Relocate gate to non-stress area
• Increase gate size to allow higher flow rate
and lower molded-in stress
Wet material
• Check moisture.
Sink Marks
Melt too hot • Decrease nozzle and barrel temperatures
Insufficient
material volume
• Increase shot size
• Increase packing pressure
Part geometry
too thick
• Reduce wall thickness
• Reduce rib thickness
Processing Guide 5
Flash
Injection pressure
too high
• Decrease injection pressure
• Increase clamp pressure
• Increase transfer position
Excess
material volume
• Adjust transfer position
• Decrease pack pressure
• Decrease shot size
Melt or mold
too hot
• Decrease nozzle and barrel temperatures
• Decrease mold temperature
Loose clamp • Reset mold height
• Increase clamp tonnage
Shrink
Too much shrink • Increase cooling time
Too little shrink • Decrease cooling time
Burning
• Reduce decompression
Mold design • Clean, widen and increase number of vents
• Increase gate size to reduce shear
Wet material • Verify material is dried at proper condition
Nozzle Drool
Nozzle temperature
too hot
• Decrease nozzle temperature
• Decrease back pressure
• Increase screw decompression
• Verify material has been dried at proper conditions
Incorrect nozzle • Use reverse taper tip
Weld Lines
Melt front
temperatures are
too low
• Increase pack and hold pressure
Mold design
• Increase gate size
• Identify end of fill pattern and verify proper
vent location
• Add vents or increase vent width
• Move gate location
6 Artisan Pre-Colored Thermoplastics
Warp
• Increase melt temp
• Reduce injection speed
• Increase pack pressure
• Increase pack time
• Decrease mold temperature
• Increase cool time
Mold design • Non-uniform mold cooling
Part design • Non-uniform wall thickness
Thermolator incorrect
temperature
• Check settings
• Inspect thermocouple
Sticking in Mold
Overfilled cavity
• Decrease injection rate and pressure
• Decrease hold pressure
• Decrease cooling time
Part too hot
• Decrease barrel temperature
• Decrease mold temperature
• Increase cooling time
Mold design • Increase draft angle
• Polish cores in direction of ejection
Black Specks
Contamination • Purge machine
Degradation
• Reduce melt temperature
• Reduce screw speed
• Reduce back pressure
Machine related • Check for wear on screw, barrel or check ring
Delamination
• Increase melt temperature
• Decrease injection speed
• Purge barrel to eliminate material contamination
Mold design • Reduce sharp corners in material flow path
• Increase venting
Processing Guide 7
Discoloration
Oversheared
material
• Decrease melt temperature
• Decrease injection speed
• Reduce residence time
Mold design • Increase gate sizing
Dry material • Check moisture of material to ensure it is within the
recommended moisture percentage for molding
1.844.4AVIENT
www.avient.com
Copyright © 2020, Avient Corporation.
https://www.avient.com/sites/default/files/2025-05/AVNT May Investor Presentation_w_non-GAAP_0.pdf
Factors that could cause actual results to differ materially from those implied by these forward-looking statements include, but are not limited to:
• disruptions, uncertainty or volatility in the credit markets that could adversely impact the availability of credit already arranged and the availability and cost of credit in the future;
• the effect on foreign operations of currency fluctuations, tariffs and other political, economic and regulatory risks;
• disruptions or inefficiencies in our supply chain, logistics, or operations;
• changes in laws and regulations in jurisdictions where we conduct business, including with respect to plastics and climate change;
• fluctuations in raw material prices, quality and supply, and in energy prices and supply;
• demand for our products and services;
• production outages or material costs associated with scheduled or unscheduled maintenance programs;
• unanticipated developments that could occur with respect to contingencies such as litigation and environmental matters;
• our ability to pay regular quarterly cash dividends and the amounts and timing of any future dividends;
• information systems failures and cyberattacks;
• our ability to service our indebtedness and restrictions on our current and future operations due to our indebtedness;
• amounts for cash and non-cash charges related to restructuring plans that may differ from original estimates, including because of timing changes associated with the underlying actions;
• other factors affecting our business beyond our control, including without limitation, changes in the general economy, changes in interest rates, changes in the rate of inflation, geopolitical conflicts, tariffs, and any recessionary conditions; and
• other factors described in our Annual Report on Form 10-K under Item 1A, “Risk Factors.”
You are
advised to consult any further disclosures we make on related subjects in our reports on Form 10-Q, 8-K and 10-K that we provide to the Securities and Exchange Commission.
Share gains and geographic penetration
all Avient
Amplify innovation
Copyright © .
2025 8
Build new
platforms
of scale
GROW BUSINESS AT
10% PLUS CAGR
1.
https://www.avient.com/sites/default/files/2021-04/avient-sustain-2019-210419-interactive.pdf
Hickory, North Carolina
8.
Gyor, Hungary 8.
Santa Clara, Mexico 8.
https://www.avient.com/sites/default/files/2020-10/2019-avient-sustainability-report.pdf
Hickory, North Carolina
8.
Gyor, Hungary 8.
Santa Clara, Mexico 8.
https://www.avient.com/sites/default/files/2020-09/sustainabilityreport2018.pdf
Lima, Peru 8.
Pasadena, Texas 8.
Lima, Peru 8.
https://www.avient.com/sites/default/files/2020-08/colormatrix-amosorb-low-haze-product-bulletin-8.5x11.pdf
https://www.avient.com/sites/default/files/2021-11/polyone-belgium-name-change-notarial-certificate-nov-8-2021.pdf
https://www.avient.com/sites/default/files/2021-11/polyone-sarl-egm-deed-name-change-nov-8-2021.pdf
https://www.avient.com/sites/default/files/2025-02/News Release - AVNT-2024.12.31-News Release 2.12.25 2PM_0.pdf
The current macro environment presents several uncertainties related to policy, inflation,
foreign exchange and interest rates which provides for a broader set of potential outcomes for
the year,” Ms.
Building off our strong performance in 2024, I remain optimistic in our team’s ability to achieve
the long-term financial targets we shared at Investor Day last December.”
3
Webcast Details
Avient will provide additional details on its 2024 fourth quarter and full year results, as well as its
2025 full year outlook during its webcast scheduled for 8:00 a.m.
You are advised to consult any further
disclosures we make on related subjects in our reports on Form 10-Q, 8-K and 10-K that we
provide to the Securities and Exchange Commission.
6
Investor Relations Contact:
Giuseppe (Joe) Di Salvo
Vice President, Treasurer and Investor Relations
Avient Corporation
+1 440-930-1921
giuseppe.disalvo@avient.com
Media Contact:
Kyle G.